F-00095 - Can I use 'For Construction' drawings in the As Built submission?
Yes. The GBCA requires evidence that the drawings supplied are as constructed, whether they have an ‘As Built’ stamp or not. 'For Construction' drawings are acceptable provided they are accompanied by formal confirmation from the head contractor or other relevant professional(s) that the For Construction drawings depict the site as-built...
Published on Tue, 31 Mar 2020
F-00115 - Can off-site renewable energy (e.g. GreenPower) be apportioned over the length of the building power supply contract?
Yes. For projects targeting the Reference Building/Fitout Pathway, where the percentage of off-site renewable energy is procured in stages over the length of the supply contract, the effective percentage of the supply contract can be applied. This is done by multiplying the percentage of off-site supply by the percentage of the...
Published on Tue, 10 Dec 2024
F-00367 - When should project teams submit for the optional Designed Assessment / Design Review?
The GBCA has no specific requirement as to when registered projects should submit for a Designed Assessment. Below is some guidance to help establish the best timing for your project. This supplements information provided in the rating tool Submission Guidelines.  Purpose A Designed Assessment (or Design Review under the Legacy rating tools)...
Published on Wed, 24 Jan 2024
F-00335 - How can project teams demonstrate compliance when a contractor has become insolvent?
The GBCA recommends that, when a contractor, sub-contractor, consultant, or other party involved in a Green Star registered project is unable to complete project works or provide documentation for the Green Star submission due to insolvency or another unforeseen event, the project team should contact the GBCA as soon as...
Published on Tue, 1 Aug 2023
F-00286 - Instances where a technical question no longer needs to be submitted by a project team
Technical questions related to Innovation were previously marked as free of charge. However moving forward Innovation related technical questions will be charged the standard fees of $220 (excl. of GST) as per a technical question. The following is a list of all places in the rating tool where a technical...
Published on Mon, 17 Oct 2022
F-00275 - Is there an alternative to demonstrating idle and standby energy performance requirement from Vertical Transportation?
Projects may demonstrate compliance with the 'lift idle and standby energy' requirement from the Vertical Transportation criteria by demonstrating that the following energy saving features have been incorporated in the lift specification: Energy efficient Gearless AC Machines with regenerative VVVF drives; Low energy LED lighting; Shutdown of non-essential lighting, screens, etc. when...
Published on Tue, 13 Sep 2022
F-00159 - If a residential project's HVAC system doesn't have a star rating, can it comply with the NatHERS pathway?
Yes. Projects targeting the NatHERS pathway in the Greenhouse Gas Emissions credit from Green Star - Design & As Built that have air conditioning equipment which isn't covered by the star rating system (AS3823.2-2011 or AS 3823.2-2013, whichever is applicable) or are targeting the Residential pathway in the Energy Use...
Published on Thu, 8 Feb 2024
F-00292 - Can nature based offsets be used instead of Renewable Electricity Certificates for Fuel Switching?
Yes, eligible nature based offsets can be used in lieu of Renewable Energy Certificates (RECs) when targeting the Fuel Switching credit within pathways A, B, D or E of the Greenhouse Gas Emissions credit from Green Star - Design & As-Built v1.3. Nature based offsets must be from an approved scheme...
Published on Fri, 7 Oct 2022
F-00238 - Is there an alternative pathway for projects to target Credit 15B.2.3 Domestic Hot Water?
Yes. Projects may target 2 points under 15B.2.3 Domestic Hot Water from Green Star - Design & As Built by using an electric heat pump with a minimum COP of 3.5 on the condition that the heat pump will be powered by 100% renewable energy (on-site or off-site).       
Published on Fri, 23 Sep 2022
F-00084 - Can I use certified Carbon Neutral Certified Electricity in the Greenhouse Gas Emissions credit?
Yes.  The GBCA does recognise 'Carbon Neutral Certified' electricity authorised under the National Carbon Offset Standard. This approved carbon neutral electricity is recognised on a 3:1 ratio. That is, for every three energy efficiency points, one point can be claimed for the procurement of carbon neutral electricity on a long term contract. For example, if a...
Published on Mon, 12 Sep 2022
F-00202 - Can a project powered by the ACT electricity grid claim to be powered by 100% renewables?
Yes, a project connected to the Australian Capital Territory (ACT) electricity grid may claim the associated benefits in Green Star, when the respective conditions that are met, depending on scenario applicable to the project.    Scenario 1: Green Star - Design & As-Built project designed to operate as All-electric: For the purposes of...
Published on Wed, 9 Mar 2022
F-00021 - Can Large-scale Generation Certificates (LGC's) be used in Green Star projects?
Yes, large-scale generation certificates (LGCs) are accepted in Green Star in the following scenarios; On Site Renewables Electricity from on-site systems where LGCs or STCs are generated. Off Site Renewables  Renewable electricity purchased directly from a generator / retailer through a PPA or contract where LGC’s are provided to user and the LGCs are...
Published on Wed, 18 Aug 2021
F-00205 - Can biogas be considered a renewable energy source?
While biogas in some instances can be considered a renewable energy source, it is not currently accepted under Green Star for the purposes of the Fuel Switching credit.  There are two reasons for this: A. If the biogas supply is being provided via another means other than the reticulated network, there...
Published on Fri, 16 Apr 2021
F-00181 - How do I know what type of documentation is accepted for a Design Review rating?
We’ve developed a short guidance document for project teams on what level of documentation is acceptable for Design Review – Green Star Design & As Built and Green Star – Interiors. This Design Review Guidance provides answers to common questions asked by project teams. The Guidance - Submitting for Design Review document is...
Published on Fri, 13 Nov 2020
F-00178 - Can project teams use the Market-Based Method when targeting off-site renewables in the GHG credit?
Yes. Project teams using a Market-Based Method approach in line with the 'GHG Protocol Scope 2 Guidance' amendment of the GHG Protocol Corporate Standard to account for the purchase of 100% off-site renewable energy may claim 100% off-site renewables in the Greenhouse Gas Emissions credit in Green Star - Design &...
Published on Tue, 20 Oct 2020
F-00134 - Can the GHG credit from Design & As Built v1.3 be used by projects registered under the previous rating tools?
No, Projects registered under the Green Star - Design & As Built  v1, Green Star - Design & As Built  v1.1 or Green Star - Design & As Built  v1.2  cannot target the new credit criterion from Green Star - Design & As Built v1.3. Where a registered Green Star project is...
Published on Tue, 15 Sep 2020
F-00156 - Can a Class 2 building use a just-compliant NatHERs building envelope load rather than Class 3 modelling?
Class 2 multi-unit residential projects may use a Class 2 NCC just-compliant NatHERs building fabric/envelope load as the reference case for the purposes of credit 15E - Greenhouse Gas Emissions Reduction - Reference Building Pathway. The project team may scale (increase) the annual hourly heating and cooling loads obtained from...
Published on Fri, 19 Jun 2020
F-00122 - Can I promote my project if it is registered for Green Star, but not yet certified?
Before achieving certification you can promote your Green Star registered project in writing, but cannot use the Green Star logo or Green Star certification trade mark. The Green Star certification trade mark can only be used once the project is certified. The Marketing and Style Guide explains how Green Star certified projects can...
Published on Mon, 6 Jan 2020
F-00006 - Is the supporting documentation listed in each credit required for submission?
No. All supported documentation listed for each credit in the Submission Guidelines are suggestions only, unless specified otherwise. Alternate documentation to those listed can be used by project teams to demonstrate credit compliance if it adequately supports the claims made within the Submission Templates.
Published on Tue, 26 Jun 2018
F-00026 - Submission formatting: referencing files in multiple credits
Documents can be referenced, rather than duplicated in credits, as long as the Submission Templates include both: hyperlinks to the relevant document(s); and references to specific page numbers within the document(s) which demonstrate compliance with the specific credit. Page numbers are likely to change for each credit submission, as appropriate to the credit compliance being demonstrated. Please note...
Published on Mon, 16 Jul 2018

Disclaimer

These FAQs are:

  • provided as additional technical assistance for Green Star users.
  • optional and free to use on Green Star projects.

When used on Green Star projects, make sure to:
  • state the FAQ number on the Submission Template.
  • click on "Download" to save the FAQ.
  • include the PDF in the submission.

The GBCA reserves the right to add or remove FAQ at our discretion.