FAQ F-00069
Can energy metering of distinct uses be based off electricity demand rather than energy?

Yes. In regards to energy meters for 6.0.1 Metering Distinct Uses or Floors, the GBCA approves the criteria to be amended to "where the electrical load for a single item exceeds 5% of the total electricity (power) demand for the project, or 100kW, it must be individually metered". 

This is based on the understanding that the overarching metering strategy for Green Star is to ensure that all significant loads are individually metered.





Rating Tools

This FAQ is related to the following Rating Tools, Categories or Credits:

  • Green Star - Design & As Built v1 / Management / 6 Metering
  • Green Star - Design & As Built v1.1 / Management / 6 Metering
  • Green Star - Design & As Built v1.2 / Management / 6 Metering and Monitoring - Metering
  • Green Star - Design & As Built v1.3 / Management / 6.0 Metering
  • Green Star - Design & As Built v1.3 / Management / 6 Metering and Monitoring
  • Green Star - Interiors v1 / Management / 5 Metering and Monitoring - Metering
  • Green Star - Interiors v1.1 / Management / 5 Metering and Monitoring - Metering
  • Green Star - Interiors v1.2 / Management / 5 Metering and Monitoring - Metering
  • Green Star - Interiors v1.3 / Management / 5.0 Metering
  • Green Star - Interiors v1.3 / Management / 5 Metering and Monitoring


Disclaimer

These FAQs are:

  • provided as additional technical assistance for Green Star users.
  • optional and free to use on Green Star projects.

When used on Green Star projects, make sure to:
  • state the FAQ number on the Submission Template.
  • click on "Download" to save the FAQ.
  • include the PDF in the submission.

The GBCA reserves the right to add or remove FAQ at our discretion.





Have more questions?

Submit a question by selecting an option below: