How many points are available in the 19B pathway (Life Cycle Impacts)?

Green Star - Design & As Built v1, v1.1

There 8 points available between the options in the 19B pathway (Life Cycle Impacts), however, only a maximum of 5 points can be awarded depending on the project’s specific conditions.

The following options are included in this pathway:

  • 19B.1 - Concrete;
  • 19B.2 - Steel; and
  • 19B.3 - Building Reuse

 

Green Star - Design & As Built v1.2, v1.3

There 8 points available between the options in the 19B pathway (Life Cycle Impacts), however, only a maximum of 5 points can be awarded depending on the project’s specific conditions.

The following options are included in this pathway:

  • 19B.1 - Concrete;
  • 19B.2 - Steel; and
  • 19B.3 - Building Reuse; and
  • 19B.4 - Structural Timber

 





Rating Tools

This FAQ is related to the following Rating Tools, Categories or Credits:

  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Assessment
  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Assessment: Additional Reporting
  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Assessment: Comparative Life Cycle Assessment
  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Impacts - Building Reuse: Facade Reuse
  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Impacts - Building Reuse: Structure Reuse
  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Impacts - Concrete: Aggregates Reduction
  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Impacts - Concrete: Portland Cement Reduction
  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Impacts - Concrete: Water Reduction
  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Impacts - Steel: Reduced Mass of Steel Framing (Steel framed building)
  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Impacts - Steel: Reduced Use of Steel Reinforcement (Concrete framed building)
  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Impacts - Structural Timber: Reduced Embodied Impacts
  • Green Star - Design & As Built v1.2 / Materials / 19 Life Cycle Impacts - Structural Timber: Responsible Sourcing


Disclaimer

These FAQs are:

  • provided as additional technical assistance for Green Star users.
  • optional and free to use on Green Star projects.

When used on Green Star projects, make sure to:
  • state the FAQ number on the Submission Template.
  • click on "Download" to save the FAQ.
  • include the PDF in the submission.

The GBCA reserves the right to add or remove FAQ at our discretion.





Have more questions?

Submit a question by selecting an option below: