Does the NABERS rated period need to align with the performance period in Green Star - Performance?

Yes, as closely as possible. 

Project that are pursuing any NABERS pathway in Green Star - Performance must align the rated period of the NABERS rating with the performance period of the Green Star - Performance rating as closely as possible, within three months either side of the performance period. 

For example, if the performance period is 01/01/2018 - 31/12/2018 for Green Star - Performance, the 12 month NABERS rated period must fall within 01/10/17 to 31/03/19.

The NABERS Certificate and report must be provided as part of the submission. 

 





Rating Tools

This FAQ is related to the following Rating Tools, Categories or Credits:

  • Green Star - Performance v1 / Energy
  • Green Star - Performance v1 / Water
  • Green Star - Performance v1.1 / Energy
  • Green Star - Performance v1.1 / Water
  • Green Star - Performance v1.2 / Energy
  • Green Star - Performance v1.2 / Water
  • Green Star - Performance PILOT / Energy
  • Green Star - Performance PILOT / Water


Disclaimer

These FAQs are:

  • provided as additional technical assistance for Green Star users.
  • optional and free to use on Green Star projects.

When used on Green Star projects, make sure to:
  • state the FAQ number on the Submission Template.
  • click on "Download" to save the FAQ.
  • include the PDF in the submission.

The GBCA reserves the right to add or remove FAQ at our discretion.





Have more questions?

Submit a question by selecting an option below: