EPA Victoria Office Fitout

6 Star Green Star Rating - Green Star - Office Interiors v1.1

  • Status Certified
  • Address
    200 Victoria Street
    Carlton VIC
  • Certified Thu 11 Oct 2012
  • Score 80
  • Applicant(s)
    EPA Victoria
  • Architect
    Woods Bagot Pty Ltd
  • Building Services Engineer
    Aurecon Australasia Pty Ltd
  • Acoustic Consultant
    Aurecon Australasia Pty Ltd
  • Main Contractor
    Hansen Yuncken Pty Ltd
  • Local Planning Authority
    City of Melbourne
  • Project Manager
    Montlaur
  • Quantity Surveyor
    Altus Group
  • Building Surveyor
    PLP Building Surveyors & Consultants Pty Ltd

Category Achievements

Management

  • A Green Star Accredited Professional is a principle participant in the project team to provide advice on the Green Star aims and processes from design through to the delivery.
  • Comprehensive pre-commissioning, commissioning and quality monitoring occurred for the tenancy.
  • Contracted for a 12 month building tuning period after handover, including quarterly reviews and final recommissioning.
  • An Environmental Management Plan (EMP) was implemented in accordance with Section 4 of the NSW Environmental Management System Guidelines during construction. The contractor held ISO14001 accreditation applicable to the construction works of the building.
  • The contractor implemented a Waste Management Plan and 80% of construction waste by weight was re-used or recycled during fitout works.

Indoor Environment Quality

  • 150% improvement above the the fresh air rate requirements in AS 1668.2-1991 promotes healthy indoor environment.
  • Volatile organic compounds are minimised in 95% of painted surfaces and all carpets, adhesives and sealants.
  • All composite wood products are low-formaldehyde emissions under EN standards.
  • A dedicated tenant exhaust riser is installed to remove indoor pollutants from printing and photocopy areas.
  • Plants with positive indoor environment benefits are distributed across the fitout at one large (or two small) pots per workstation, in line with a Horticultural Maintenance Plan.
  • Flat-screen, mounted workstation monitors are provided with the fitout and can be manually adjusted to provide the ability to avoid daylight glare.
  • Installed high frequency ballasts reduce occupants' eye strain from low frequency flicker.
  • The lighting levels are appropriate but not excessive for the space's needs.
  • 60% of workstations have direct line of site to outdoor environments.
  • 80% of workstations can control thermal comfort (air supply, temperature) individually.
  • All asbestos found during construction works has been removed.

Energy

  • The tenancy achieves at least a 5 Star NABERS (formerly ABGR) rating, with an additional 20% CO2 reduction.
  • Sub-metering is installed for tenancy lighting and small power consumption.
  • Individual switches are installed for enclosed spaces and zones in accessible locations. Further, 95% of the Net Lettable Area (NLA) contains an individually addressable lighting system.

Transport

  • Many public transport networks operate in close proximity with frequent peak hour services.
  • Car parking provisions are 50% less than the maximum local planning allowance.
  • Cyclist facilities are available, with secure bicycle storage for 10% of tenancy occupants and accessible shower and change facilities.

Water

  • The use of potable water is greater than a 'best practice' scenario.
  • All dishwashers in the tenancy are 5A rated.

Materials

  • The tenancy provided workstations with reduced environmental impact, relative to available alternatives.
  • Alternative materials replace 30% (by cost) of total PVC costs.
  • Flooring throughout the tenancy has a reduced environmental impact, relative to available alternatives.
  • Walls and partitions in the tenancy have a reduced environmental impact, relative to available alternatives.
  • The tenancy provided chairs with reduced environmental impact, relative to available alternatives.
  • The tenancy provided tables with reduced environmental impact, relative to available alternatives.
  • The tenancy provided storage units with reduced environmental impact, relative to available alternatives.
  • Joinery throughout the tenancy has a reduced environmental impact, relative to available alternatives.
  • Recycling and waste management for typical office waste is included and collected on a frequent basis throughout the tenancy.

Land Use & Ecology

  • The tenancy is located in a Green Star Office As Built 6 Star rated building.
  • The building management is contractually required to implement environmental initiatives concerning maintenance and monitoring of various tenancy aspects.
  • The tenancy lease agreement requires participation in a number of monitoring and maintenance intiatives for the tenancy.
  • 75% of the tenancy fitout space was preciously tenanted.

Emissions

  • All refrigerants used have an Ozone Depleting Potential (ODP) of zero.
  • All thermal insulation avoids the use of ozone-depleting substances in both manufacture and composition.