Error. File Path Not Found:
C:\inetpub\wwwroot\gbca.org.au\trunk\greenstar-projects\images\projects
-
Status Certified
-
Address
200/204 Murray St Perth WA
- Certified Fri 6 May 2016
- Score 48
- Building Type New Construction
- Applicant(s)
ISPT Operations Pty Ltd
-
ESD Consultant
Stantec
-
Architect
Hames Sharley
-
Building Services Engineer
Stantec
-
Owner
ISPT Operations Pty Ltd
-
Project Manager
NS Projects
-
Structural/Civil Engineer
Jones Nicholson Pty Ltd
-
Quantity Surveyor
WT Partnership
|
Category Achievements
Management
- A Green Star Accredited Professional will be engaged as part of the project team
- Comprehensive commissioning will be done according to recognised guidelines for building services
- A Building Users' Guide with relevant information will be provided to the building owner and users
- A comprehensive, site-specific Environmental Management Plan for the works will be implemented
- A valid ISO14001 Environmental Management System will be in place prior to/throughout the project
- 80% by mass of demolition and construction waste will be reused or recycled
- A comprehensive Waste and Recycling Management Plan will reduce overall operational waste
- Building infrastructure will facilitate reduction of operational waste and disposal
- Building Management and Control System (BMCS) will demonstrate actual performance of all sub meters
Indoor Environment Quality
- 30% of the nominated area will provide good levels of daylight for building users.
- 95% of internal painted surfaces will be low in volatile organic compounds
- 95% of all adhesives and sealants will be low in volatile organic compounds
- 95% of carpets and floor coverings will be low in volatile organic compounds
- All composite wood products will have low formaldehyde emissions, or contain no formaldehyde
Energy
- Greenhouse gas emissions are predicted to be 55% less than a standard practice building.
- Energy sub-metering will be done for the building and major energy usage data will be monitored
- Sub-metering provided to each tenancy, and energy sub-metering will be done for the building
Transport
- Car parking will be at least 50% below maximum or not more than the minimum planning allowance
- cyclist facilities will be provided for 5% of building staff
- Public transport networks will operate in close proximity with regular service during peak hour
- Medium-to-high-density residential developments will be located within 250m of the retail centre
Water
- Potable water use will be more efficient than a standard practice building
Materials
- A dedicated storage area and other building features which facilitate recycling will be in place
- 90% of the existing major structure by gross building volume will be reused
- 60% of the total cost of PVC will be replaced with alternative materials
Land Use & Ecology
- The project will be a refurbishment
- The project will have no adverse impact on vulnerable species, native vegetation or ecological value
Emissions
- All refrigerants will have an Ozone Depleting Potential of zero
- Thermal insulants avoid ozone depleting substances in their manufacture and composition
- Building outflow to sewerage from occupant usage will be 50% less as compared to standard practice