4 Star Green Star Rating - Green Star - Retail Centre Design v1

  • Status Certified
  • Address
    200/204 Murray St
    Perth WA
  • Certified Fri 6 May 2016
  • Score 48
  • Building Type New Construction
  • Applicant(s)
    ISPT Operations Pty Ltd
  • ESD Consultant
    Stantec
  • Architect
    Hames Sharley
  • Building Services Engineer
    Stantec
  • Owner
    ISPT Operations Pty Ltd
  • Project Manager
    NS Projects
  • Structural/Civil Engineer
    Jones Nicholson Pty Ltd
  • Quantity Surveyor
    WT Partnership

Category Achievements

Management

  • A Green Star Accredited Professional will be engaged as part of the project team
  • Comprehensive commissioning will be done according to recognised guidelines for building services
  • A Building Users' Guide with relevant information will be provided to the building owner and users
  • A valid ISO14001 Environmental Management System will be in place prior to/throughout the project
  • A comprehensive, site-specific Environmental Management Plan for the works will be implemented
  • 80% by mass of demolition and construction waste will be reused or recycled
  • A comprehensive Waste and Recycling Management Plan will reduce overall operational waste
  • Building infrastructure will facilitate reduction of operational waste and disposal
  • Building Management and Control System (BMCS) will demonstrate actual performance of all sub meters

Indoor Environment Quality

  • 30% of the nominated area will provide good levels of daylight for building users.
  • 95% of carpets and floor coverings will be low in volatile organic compounds
  • 95% of all adhesives and sealants will be low in volatile organic compounds
  • 95% of internal painted surfaces will be low in volatile organic compounds
  • All composite wood products will have low formaldehyde emissions, or contain no formaldehyde

Energy

  • Greenhouse gas emissions are predicted to be 55% less than a standard practice building.
  • Energy sub-metering will be done for the building and major energy usage data will be monitored
  • Sub-metering provided to each tenancy, and energy sub-metering will be done for the building

Transport

  • Car parking will be at least 50% below maximum or not more than the minimum planning allowance
  • cyclist facilities will be provided for 5% of building staff
  • Public transport networks will operate in close proximity with regular service during peak hour
  • Medium-to-high-density residential developments will be located within 250m of the retail centre

Water

  • Potable water use will be more efficient than a standard practice building

Materials

  • A dedicated storage area and other building features which facilitate recycling will be in place
  • 90% of the existing major structure by gross building volume will be reused
  • 60% of the total cost of PVC will be replaced with alternative materials

Land Use & Ecology

  • The project will be a refurbishment
  • The project will have no adverse impact on vulnerable species, native vegetation or ecological value

Emissions

  • All refrigerants will have an Ozone Depleting Potential of zero
  • Thermal insulants avoid ozone depleting substances in their manufacture and composition
  • Building outflow to sewerage from occupant usage will be 50% less as compared to standard practice