Status Certified
-
Address
Corner of Thomas and Walker Street Dandenong VIC
- Certified Wed 17 Jul 2013
- Score 75
- Applicant(s)
GROCON DEVELOPMENTS VIC PTY LTD (parent GFM Delivery Services Management Pty Ltd)
-
Project Manager
GFM Delivery Services Management Pty Ltd
-
Architect
HASSELL Ltd
-
Structural/Civil Engineer
Winward Structures
-
Building Services Engineer
Umow Lai Pty Ltd
-
Acoustic Consultant
Marshall Day Acoustics
-
Main Contractor
GFM Delivery Services Management Pty Ltd
-
Local Planning Authority
Dandenong North Primary School
|
Category Achievements
Management
- A Green Star Accredited Professional is a principle participant in the project team to provide advice on the Green Star aims and processes from design through to the delivery.
- Provided a comprehensive, yet simple Tenant Guide for the relevant building and tenancy systems to the users and owner.
- An Environmental Management Plan (EMP) was implemented in accordance with Section 4 of the NSW Environmental Management System Guidelines during construction. The contractor held ISO14001 accreditation applicable to the construction works of the building.
- The contractor implemented a Waste Management Plan and 80% of construction waste by weight was re-used or recycled during fitout works.
Indoor Environment Quality
- 50% improvement above the the fresh air rate requirements in AS 1668.2-1991 promotes healthy indoor environment.
- Volatile organic compounds are minimised in 95% of painted surfaces and all carpets, adhesives and sealants.
- All composite wood products are low-formaldehyde emissions under EN standards.
- Plants with positive indoor environment benefits are distributed across the fitout at one large (or two small) pots per every two workstations, in line with a Horticultural Maintenance Plan.
- 30% of work settings have good daylight levels for building users.
- Automated blinds and screens with a Visual Light Transmittance of less than 10% are installed in the tenancy to reduce daylight glare, with manual overrides. Additionally, flat-screen, mounted workstation monitors are provided with the fitout and can be manually adjusted to provide the ability to avoid daylight glare.
- Installed high frequency ballasts reduce occupants' eye strain from low frequency flicker.
- 60% of workstations have direct line of site to outdoor environments.
- 80% of workstations can control thermal comfort (air supply, temperature) individually.
Energy
- The tenancy achieves at least a 5 Star NABERS (formerly ABGR) rating, with an additional 20% CO2 reduction.
- Sub-metering is installed for tenancy lighting and small power consumption.
- Individual switches are installed for enclosed spaces and zones in accessible locations. Further, 95% of the Net Lettable Area (NLA) contains an individually addressable lighting system.
Transport
- Many public transport networks operate in close proximity with frequent peak hour services.
- Car parking provisions are 50% less than the maximum local planning allowance.
- Cyclist facilities are available, with secure bicycle storage for 10% of tenancy occupants and accessible shower and change facilities.
Water
- The use of potable water is greater than a 'best practice' scenario.
Materials
- The tenancy provided workstations with reduced environmental impact, relative to available alternatives.
- Flooring throughout the tenancy has a reduced environmental impact, relative to available alternatives.
- The tenancy provided chairs with reduced environmental impact, relative to available alternatives.
- The tenancy provided tables with reduced environmental impact, relative to available alternatives.
- The tenancy provided storage units with reduced environmental impact, relative to available alternatives.
- Ceilings in the tenancy have a reduced environmental impact, relative to available alternatives.
- Recycling and waste management for typical office waste is included and collected on a frequent basis throughout the tenancy.
Land Use & Ecology
- The tenancy is located in a Green Star Office As Built 6 Star rated building.
- The Building Layout Efficiency (Net Occupiable Area/Gross Internal Area) is at least 85%.
- The building management is contractually required to implement environmental initiatives concerning maintenance and monitoring of various tenancy aspects.
- The tenancy lease agreement requires participation in a number of monitoring and maintenance intiatives for the tenancy.
- 90% of Net Lettable Area (NLA) of the tenancy is a fully integrated fitout with the base building.