Status Certified
-
Address
Levels 10-13 & 16 452 Flinders Street Melbourne VIC
- Certified Fri 16 Dec 2011
- Score 69
- Applicant(s)
Jacobs Group (Australia) P/L
-
Project Manager
Sinclair Knight Merz
-
Architect
Incorp Interior Designs
-
Structural/Civil Engineer
Meinhardt-Bonacci
-
Quantity Surveyor
Sinclair Knight Merz
-
Acoustic Consultant
Arup Australasia Pty Ltd
-
Building Surveyor
Gardner Group
-
Main Contractor
Schiavello Construction P/L
-
Local Planning Authority
City of Melbourne
|
Category Achievements
Management
- A Green Star Accredited Professional is a principle participant in the project team to provide advice on the Green Star aims and processes from design through to the delivery.
- Comprehensive pre-commissioning, commissioning and quality monitoring occurred for the tenancy.
- The design team and contractor transferred the information and documentation to the base building owner.
- Contracted for a 12 month building tuning period after handover, including quarterly reviews and final recommissioning.
- Provided a comprehensive, yet simple Tenant Guide for the relevant building and tenancy systems to the users and owner.
- An Environmental Management Plan (EMP) was implemented in accordance with Section 4 of the NSW Environmental Management System Guidelines during construction. The contractor held ISO14001 accreditation applicable to the construction works of the building.
- The contractor implemented a Waste Management Plan and 80% of construction waste by weight was re-used or recycled during fitout works.
Indoor Environment Quality
- Volatile organic compounds are minimised in 95% of painted surfaces and all carpets, adhesives and sealants.
- All composite wood products are low-formaldehyde emissions under EN standards.
- All accessible supply air ductwork has been cleaned prior to occupancy.
- Plants with positive indoor environment benefits are distributed across the fitout at one large (or two small) pots per workstation, in line with a Horticultural Maintenance Plan.
- Automated blinds and screens with a Visual Light Transmittance of less than 10% are installed in the tenancy to reduce daylight glare, with manual overrides.
- Installed high frequency ballasts reduce occupants' eye strain from low frequency flicker.
- The lighting levels are appropriate but not excessive for the space's needs.
- The thermal comfort control improvements were achieved as a result of modification to the existing base building systems.
Energy
- The tenancy achieves at least a 5 Star NABERS (formerly ABGR) rating, with an additional 20% CO2 reduction.
- Sub-metering is installed for tenancy lighting and small power consumption.
- Sub-metering is installed for substantive energy uses within the tenancy.
Transport
- Many public transport networks operate in close proximity with frequent peak hour services.
- Car parking provisions are 50% less than the maximum local planning allowance.
- Cyclist facilities are available, with secure bicycle storage for 10% of tenancy occupants and accessible shower and change facilities.
- The cyclist facilities were installed as a result of modification to the existing base building.
Water
- The use of potable water is greater than a 'best practice' scenario.
Materials
- The tenancy provided workstations with reduced environmental impact, relative to available alternatives.
- Alternative materials replace 60% (by cost) of total PVC costs.
- Flooring throughout the tenancy has a reduced environmental impact, relative to available alternatives.
- The tenancy provided chairs with reduced environmental impact, relative to available alternatives.
- The tenancy provided tables with reduced environmental impact, relative to available alternatives.
- The tenancy provided storage units with reduced environmental impact, relative to available alternatives.
- Recycling and waste management for typical office waste is included and collected on a frequent basis throughout the tenancy.
Land Use & Ecology
- The building management is contractually required to implement environmental initiatives concerning maintenance and monitoring of various tenancy aspects.
- The tenancy lease agreement requires participation in a number of monitoring and maintenance intiatives for the tenancy.
- 75% of the tenancy fitout space was preciously tenanted.
Emissions
- All refrigerants used have an Ozone Depleting Potential (ODP) of zero.
- All thermal insulation avoids the use of ozone-depleting substances in both manufacture and composition.